PROJECT OVERVIEW
LANDFILL MANAGEMENT
45% stake in landfill management group (Terengganu, Malaysia)
Intergrated waste-to-energy and carbon credit solutions

STRATEGIC LOCATION

-
Site Area: 108 Acres, Kemaman District
-
Waste Type: Municipal, Schedule 1 & 2
-
Location : 40 km from East Coast Industrial Zone
-
Government approvals secured (EIA, EMP)

FACILITIES LAYOUT


-
Design Projection of ECO park in Kemaman, Terrengganu, Malaysia (Estimataed in June, 2024)
LANDFILL MANAGEMENT FLOW CHART

​​
-
After waste separation and treatment, food and organic waste are gathered into an equalisation pond to be recycled through anaerobic digestion.
-
The residual waste and sludge are then sent to wastewater treatment before being discharged.
-
Upgrading biogas means separating the Methane(CH4) from the Carbon dioxide (CO2), resulting in a pure Methane gas flow.
-
The captured methane is used to generate electricity for internal usage and off-takers and to liquefy it into bio-LNG.
INVESTMENT HIGHLIGHTS
VALUE OF THE PROJECT

-
The ECO Park Project can meet the local and regional needs of the East Coast, Malaysia.

-
The project can contribute to Malaysia's efforts to achieve 'Net Zero Carbon' by 2050.
-
Malaysia is committed to achieving its goal of becoming a carbon-neutral nation by 2050.
-
Renewable energy generation from biomass and biogas is targeted to reach 31% of its total installed capacity by 2025.



