top of page
Palm-Oil Facility and Covered Lagoon.png

Carbon Credits

Article 6.2 carbon credits from POME and landfill gas projects

Anchor 1

We develop and invest in Article 6.2 mitigation projects in Malaysia. Building on our biomethane track record, we originated the first Article 6.2 project between Korea and Malaysia. We source suitable sites, co-finance each project with Korean partners, and secure host-country authorisation and ITMO offtake.

Terengganu Project

Track record

기사 사진.jpeg

Terengganu Palm Oil Mill Biogas Upgrading Project

Kemaman, Terengganu, Malaysia

Converts palm oil mill effluent (POME) into Bio-CNG, reducing about 32,000 tCO₂e a year. The resulting ITMOs are planned for transfer to Korea.

Partners: Sudokwon Landfill Site Management Corporation (SLC), MTCO Polaris Sdn Bhd
Supported by: Malaysian Bioeconomy Development Corporation
Status: Host-country acknowledgement under Article 6.2 in progress. Construction due to start in 2027.
June 2026: SLC delivered a Letter of Intent to invest, at a ceremony in Putrajaya attended by NRES.

Terengganu project milestones: Nov 2024 MOU between environment ministries; Jun 2026 investment letter of intent; Sep 2026 Korea-Malaysia Climate Change Dialogue; Nov 2026 NRES acknowledgement at COP31; 2027-2028 construction; 2029 commercial operation

Pipeline

The Terengganu project is the first step in a planned network of more than 20 POME-based Bio-CNG facilities across Malaysia, under an RM700 million investment pipeline with the Malaysian Bioeconomy Development Corporation. We are also developing landfill gas-to-biomethane projects in Malaysia with our Korean consortium.

Biogas facility among oil palm plantations in Malaysia, with pipeline figures: 20+ POME Bio-CNG facilities planned, RM700M investment pipeline, 384,000 tCO2e annual reduction potential

What we do

01  Origination and feasibility

Site screening, baseline data collection, and technical and financial feasibility with project partners.

02  Project structuring

Joint-venture set-up with local partners, project financing and Bio-CNG offtake.

03  Host-country engagement

Preparing project documentation and working with national authorities towards acknowledgement under Article 6.2.

04  Delivery and ITMO offtake

Plant construction and operation through our Malaysian joint venture; transfer arrangements with Korean buyers.

How Article 6.2 works

How Article 6.2 works in five steps: bilateral agreement, mitigation project, authorisation, verification, and transfer of ITMOs with corresponding adjustments by both governments
Terraced Green Landfill with Vent Pipes.png

We are looking for palm oil mills in Malaysia that:

  • process 160,000–270,000 tonnes of FFB a year

  • discharge effluent to open ponds with no gas capture

  • have 3–5 acres of land beside the ponds

The feasibility study is free of charge.

Is your mill next?

© 2019–2026 Polaris Bio Co., Ltd. All rights reserved.

bottom of page